We’re about to kick off our new project at 245 Eleanor Avenue, Sacramento, CA, where we are providing comprehensive MEP, Fire Protection, Solar Design, and T24 Compliance.

Future Expansion Consideration:

This project is designed with future growth in mind. We have strategically planned all systems to accommodate a future second story, ensuring scalability for plumbing, electrical, and HVAC systems. Additionally, the electrical design is tailored to support the addition of a future elevator in the front entry alcove, positioned next to the front door, providing long-term functionality for the property.

Scope of Work: 

Mechanical Design: 

  • HVAC load calculations, duct layouts, roof plans 
  • Designed to support a future second story with scalable ductwork for future needs 

Electrical Design:

  • Full lighting, power, and panel schedule design 
  • Designed to accommodate the addition of a future elevator in the front entry alcove 
  • Scalable electrical infrastructure to support a second story expansion 

Plumbing Design:

  • Plumbing systems including domestic water, drainage, and rainwater design 
  • Domestic water and sanitary 2D riser diagrams 
  • Scalable plumbing infrastructure for future second story and expansion needs 

Fire Protection:

  • NFPA 13-compliant fire sprinkler plans and zoning, adaptable to future expansion 

Solar Design:

  • Custom solar design with panel layouts integrated into the existing structure 
  • Panel locations adjusted for current design and future expansion 

Integrated Approach:

Our team ensures that all systems are not only efficient and compliant with codes but also adaptable to future expansions, ensuring the building’s long-term functionality and growth.